Guidance
The Institute answers
Straight answers to the questions the industry actually asks about demolition competence, duty and regulation — published openly, free to quote, and reviewed by name.
Published by the Institute · reviewed
There is no shortage of material online about demolition. There is very little written by anyone whose job is to define what competence in it means. These pages are the Institute’s answers to the questions it is actually asked — by clients assuring an appointment, by engineers settling an argument, and increasingly by people asking an assistant rather than a person.
Each signed-off answer will state its position in the first paragraph, set out what that position rests on, and say plainly what it does not mean. Published answers carry a named reviewer and review date. Drafts remain visibly marked, excluded from search and must not be quoted as the Institute’s position.
5 available routes, 10 in preparation. Pages markeddraft are review copies only: they have not been signed off as the Institute’s position, carry no answer schema and are excluded from search indexing.
Appointing and assuring
For clients, principal designers and anyone who has to satisfy themselves that the people they appoint are competent.
- What qualifications does a demolition engineer need?
- Who is the duty holder for a demolition project?
- How do I check whether a demolition engineer is qualified?Answered by the register
- Do I need a demolition engineer or a structural engineer?In preparation
- What competence should I specify in a demolition tender?In preparation
Regulation and notice
The regimes that apply before a structure comes down, and the ones people most often confuse.
- Do you need a Section 80 notice to demolish a building?
- What does the Building Safety Act mean for demolition?In preparation
- When does demolition need planning permission?In preparation
Practice
For practitioners: the questions that decide whether a sequence is sound before anyone reaches the wall.
- What must a demolition method statement contain?In preparation
- When are temporary works required in demolition?In preparation
- What is a pre-demolition audit?In preparation
- What survey information should exist before demolition starts?In preparation
Getting into the profession
For anyone considering demolition engineering as a career, and for those advising them.
- How do you become a demolition engineer in the UK?In preparation
- What do TechIDE, AMIDE, MIDE and FIDE mean?In preparation
- Is there a degree in demolition?Answered on the education page
Using these. Free to quote with attribution to the Institute of Demolition Engineers. If you are citing one in a specification or tender document, link to the page rather than copying it — the answers are reviewed and corrected, and a copy will not be.
A question missing? If there is something the industry keeps asking and the Institute has not answered, tell us. That is how this list should grow.